Here’s how it all got started

ALCOSAN was formed in 1946 to construct and operate a plant to treat sewage and industrial waste.
Click the photo for a full description.

 

ALCOSAN Board

On March 4, 1946, the Allegheny County Commissioners adopted a resolution creating the Allegheny County Sanitary Authority (ALCOSAN) to oversee an $80 million sewage treatment program for Allegheny County.

Listed left to right: Chairman John F. Laboon (1), Secretary David Oldblum (2), Treasurer William B. Rodgers (3), Chief Counsel Leon Wald Esq. (4), Managing Engineer Ellis E. Bankson (5), Cornelius D. Scully (6), Charles A. Finley (7) and Paul S. Aaron (8) were appointed to lead those efforts.

Industrial Waste

At the time of ALCOSAN’s creation, raw sewage and industrial wastes flowed directly into district waterways, severely impacting aquatic life in the Ohio, Monongahela and Allegheny Rivers.

ALCOSAN Site

In 1948, ALCOSAN released the first of five reports recommending the construction of an $82 million single plant treatment system on a tract of land on the north side of the Ohio River, opposite McKees Rocks. This is what the site looked like before construction began.

Groundbreaking Boat Ride

Construction of ALCOSAN’s wastewater treatment system began in 1956. To celebrate, ALCOSAN invited dignitaries and other community leaders, who are shown in this photo, on a special boat ride to the site of the future treatment plant.

Main Pump Station Structure

Once construction was underway, Executive Director Laboon concluded that the dead weight of the main pump station was not sufficient. To address Director Laboon’s concerns, holes were drilled into the bottom rock of the excavation and heavy reinforcing bars were used to anchor the concrete floor of the pump station. This is an overhead photo of that work.

Chimney Stack

In this photo, workers build ALCOSAN’s incinerator chimney stack, which stands 300 feet tall.

Main Pump Installation

In this photo, workers lower one of the main sewage pumps into position in the Main Pump Station. Today, there are a total of six pumps in the station.

Intake Pipe Installation

In this photo, construction workers install an intake pipe at the ALCOSAN treatment plant site.

Treatment Plant Dedication

The ALCOSAN treatment plant was dedicated in 1959. Remnants of Hurricane Gracie forced the festivities inside. This photo shows the line-up of speakers for the ceremony.

Treatment Plant Nomination

One year after the treatment plant began operations, ALCOSAN was nominated for the “Outstanding Civil Engineering Achievement Award” by the American Society of Civil Engineers for the planning, design, construction and initial operation of the treatment system.

Need help paying your bill?

Learn More

Need help understanding your bill?

Learn More
  • Follow Us
  • Home
  • 3 Rivers Proud
  • Welcome to ALCOSAN
  • Clean Water Plan
  • TAKE ACTION
  • Blog
  • Events
  • Partners
  • PUPs Pledge
  • Sweepstakes
All content © Copyright 2021 Allegheny County Sanitary Authority
  • Alcosan.org
  • Media Tools
  • Terms and Conditions
  • Privacy Policy
  • Contact Us